RESULTS
| |
MIAMI COUNTY
DAVID L. BROWN YOUTH CENTER MOUND SYSTEM
BID TABULATION |
|
|
|
|
|
| |
MILLER BROS. EXCAVATING
TIPP CITY, OHIO |
| |
|
|
|
May 29, 2007 |
|
REF. |
ITEM |
|
UNIT OF |
APPROX. |
UNIT |
TOTAL |
UNIT |
TOTAL |
|
NO. |
NO. |
DESCRIPTION |
MEASURE |
QTY. |
COST |
COST |
COST |
COST |
|
1 |
202 |
REMOVED, AS PER PLAN |
LUMP |
1 |
$12,795.00 |
$12,795.00 |
$18,362.75 |
$18,362.75 |
|
2 |
204 |
SUBGRADE COMPACTION |
S.Y. |
36 |
$9.00 |
$324.00 |
$21.78 |
$784.08 |
|
3 |
304 |
10" AGGREGATE BASE |
C.Y. |
10 |
$50.00 |
$500.00 |
$60.00 |
$600.00 |
|
4 |
408 |
PRIME COAT, 0.40 GAL./S.Y. |
GAL. |
14 |
$12.00 |
$168.00 |
$3.75 |
$52.50 |
|
5 |
448 |
2 3/4" ASPHALT CONCRETE, INTERMEDIATE COURSE |
C.Y. |
3 |
$200.00 |
$600.00 |
$416.66 |
$1,249.98 |
|
6 |
448 |
1 1/4" ASPHALT CONCRETE, SURFACE COURSE |
C.Y. |
6 |
$225.00 |
$1,350.00 |
$212.50 |
$1,275.00 |
|
7 |
603 |
4" PVC SDR-35 CONDUIT, TYPE B, AS PER PLAN |
FT. |
20 |
$20.00 |
$400.00 |
$20.00 |
$400.00 |
|
8 |
603 |
6" PVC SDR-35 CONDUIT, TYPE B, AS PER PLAN |
FT. |
20 |
$25.00 |
$500.00 |
$25.00 |
$500.00 |
|
9 |
603 |
8" PVC SDR-35 CONDUIT, TYPE B, AS PER PLAN |
FT. |
20 |
$30.00 |
$600.00 |
$30.00 |
$600.00 |
|
10 |
603 |
4" PVC SDR-26 SANITARY FORCEMAIN, AS PER PLAN |
FT. |
470 |
$21.00 |
$9,870.00 |
$11.00 |
$5,170.00 |
|
11 |
604 |
3500 GALLON SEPTIC TANK, AS PER PLAN |
EACH |
2 |
$3,500.00 |
$7,000.00 |
$3,462.35 |
$6,924.70 |
|
12 |
659 |
SEEDING AND MULCHING, AS PER PLAN |
S.Y. |
1443 |
$1.00 |
$1,443.00 |
$1.35 |
$1,948.05 |
|
13 |
SPEC |
LIFT STATION AND DOSING TANK, AS PER PLAN |
LUMP |
1 |
$18,000.00 |
$18,000.00 |
$17,764.45 |
$17,764.45 |
|
14 |
SPEC |
ELECTRICAL SERVICE, AS PER PLAN |
LUMP |
1 |
$3,200.00 |
$3,200.00 |
$2,500.00 |
$2,500.00 |
|
15 |
SPEC |
MOUND SYSTEM INSTALLATION, AS PER PLAN |
LUMP |
1 |
$43,250.00 |
$43,250.00 |
$27,102.62 |
$27,102.62 |
| |
|
TOTAL |
|
|
|
$100,000.00 |
|
$85,234.13 |
|
|
|
|
|
|
|
|
|
|
|
|
|
The information
contained on this web site is for informational purposes only. While Choice
One makes every effort to ensure
accuracy, the material
presented may not reflect the most current developments nor is it guaranteed
to be free from error.
Nothing contained herein constitutes an
offer, contract, or promise of any kind.
|
|