ESTIMATED QUANTITIES

REF ITEM   UNIT OF APPROX. UNIT   TOTAL
NO. NO. DESCRIPTION MEASURE QTY. COST   COST
1 202 REMOVED, AS PER PLAN LUMP 1    
2 202 WALK REMOVED S.F. 235    
3 202 CURB AND GUTTER REMOVED FT. 181    
4 203 EXCAVATION, INCLUDING EMBANKMENT
   CONSTRUCTION, AS PER PLAN
C.Y. 342    
5 204 SUBGRADE COMPACTION, AS PER PLAN S.Y. 1639    
6 204 EXCAVATION OF SUBGRADE AND STRUCTURAL
   EMBANKMENT, AS PER PLAN
C.Y. 110    
7 204 GEOGRID, AS PER PLAN S.Y. 260    
8 207 INLET PROTECTION, AS PER PLAN EACH 3    
9 304 AGGREGATE BASE, AS PER PLAN C.Y. 392    
10 408 PRIME COAT, 0.40 GAL./S.Y. GAL. 571    
11 448 ASPHALT CONCRETE, INTERMEDIATE COURSE,
   TYPE 2, PG 64-22
C.Y. 100    
12 448 ASPHALT CONCRETE, SURFACE COURSE,
   TYPE 1, PG 64-22
C.Y. 60    
13 452 NON-REINFORCED CONCRETE PAVEMENT,
   AS PER PLAN
S.Y. 23    
14 603 4" PVC SDR-35 CONDUIT, TYPE B, AS PER PLAN FT. 20    
15 603 6" PVC SDR-35 CONDUIT, TYPE B, AS PER PLAN FT. 20    
16 603 8" CPSLP, TYPE B, AS PER PLAN FT. 20    
17 603 8" CPSLP  FT. 98    
18 603 12" STORM SEWER RCP CL-V, AS PER PLAN FT. 598    
19 603 SANITARY SEWER LATERALS, AS PER PLAN  FT. 30    
20 604 CATCH BASIN, TYPE 1, AS PER PLAN EACH 2    
21 604 TYPE 3 STORM MANHOLE EACH 2    
REF ITEM   UNIT OF APPROX. UNIT   TOTAL
NO. NO. DESCRIPTION MEASURE QTY. COST   COST
22 607 FENCE REMOVED AND RESET, AS PER PLAN FT. 120    
23 608 4" CONCRETE WALK, AS PER PLAN S.F. 1563    
24 608 CURB RAMPS, TYPE B3 WITH TRUNCATED
   DOMES, AS PER PLAN
S.F. 276    
25 609 CURB AND GUTTER, CITY OF TIPP CITY TYPE 1,
   AS PER PLAN
FT. 761    
26 614 MAINTAINING TRAFFIC, AS PER PLAN LUMP 1    
27 623 CONSTRUCTION LAYOUT STAKES, AS PER PLAN LUMP 1    
28 630 GROUND MOUNTED SUPPORT, NO. 3 POST FT. 37.5    
29 630 SIGN, FLAT SHEET S.F. 4.5    
30 630 TRAFFIC SIGN AND SIGN SUPPORTS
   RELOCATED, AS PER PLAN
EACH 3    
31 638 SERVICE BOX ADJUSTED TO GRADE EACH 1    
32 659 SEEDING AND MULCHING, AS PER PLAN S.Y. 523    
33 660 SODDING UNSTAKED, AS PER PLAN S.Y. 155    
34 SPEC NON-SHRINK FLOWABLE GROUT, AS PER PLAN LUMP 1    
35 SPEC ROCK EXCAVATION, AS PER PLAN C.Y. 50    
TOTAL  
               
Click here to download the quantities in Microsoft Excel for bid preparation use.
*Please note that formulas, etc., are the responsibility of the user and that the hard copy included with the bid packet is binding.