Replacement of existing bridge
with a three-span, non-composite, prestressed, box-beam bridge on capped
pile substructure including installation of a new type 5 guardrail. Provided
topographic survey, foundation investigation, preliminary and final design,
right-of-way plans, and easements. Funding: Local.