|
EXPERIENCE - STORM,
SANITARY, AND WATER |
Russia Water Distribution System, Russia, Ohio Middleport Water Distribution Improvements, Middleport, Ohio McCartyville Sanitary Sewer System, Van Buren Township, Shelby County 300,000-Gallon Water Tower, Anna, Ohio Mill Creek Sanitary Rehabilitation, Clinton Township, Shelby County Equalization Basin at WWTP, Minster, Ohio 500,000-Gallon Water Tower, Cridersville, Ohio 250,000-Gallon Water Tower, Fort Recovery, Ohio Buck Ditch Replacement, Fort Recovery, Ohio
Design of a water main distribution system, 300,000-gallon water tower, and water treatment plant for the Village. Provided a field survey, construction plans, geotechnical investigation construction bidding procedures, and construction administration. Funding: USDA, CDBG and Local. Provided services for the design of 36, 000 feet of water main distribution system improvements including a computer hydraulic model (WaterCAD Version 8). Performed a field survey and courthouse research, prepared a water distribution model and construction plans. Funding: American Recovery and Reinvestment Act. Provided engineering services for the design of a vacuum sanitary collection system and pump station to transport sewage from the Lake Loramie WWTP through the existing forcemain along State Route 119. Provided preliminary investigation, field survey, construction plans, soil borings, assessment procedures, easement preparation, bidding procedures, layout staking, construction administration and observation, and record drawings. Funding: OEPA-WPCLF, OPWC, and CDBG. Construction of a 300,000-gallon elevated, steel water storage tank. Provided geotechnical investigation, field survey, construction plans and specifications, bidding procedures, and construction administration. Funding: OPWC and Local. Rehabilitation of the sanitary sewer collection and treatment systems in the Mill Creek Subdivision. Provided a field survey, soil borings, construction plans, construction bidding procedures, layout staking, construction administration, and record drawings. Funding: OPWC and Local. Expansion of the existing WWTP by adding a 2.2 million gallon equalization basin including pump station aeration and other appurtenances. Provided survey, construction plans, bidding procedures, and construction administration. Funding: Local. Construction of a 500,000-gallon elevated water tower including site work preparation. Provided field survey, construction plans and specifications, bidding procedures, and construction administration. Funding: OWDA and Local. Construction of a 250,000-gallon elevated water storage tank. Provided distribution system analysis, surveying, construction plans and specifications, bidding procedures, and construction administration. Funding: CDBG and Local. Replacement of the Buck Ditch storm sewer from the Wabash River to the rear lot lines of Butler Street properties. Provided topographic survey, construction plans, construction bidding procedures, and construction layout staking. Funding: CDBG and Local.
Russia Water Distribution System, Russia, Ohio
Design of a water main distribution system, 300,000-gallon water tower, and water treatment plant for the Village. Provided a field survey, construction plans, geotechnical investigation construction bidding procedures, and construction administration. Funding: USDA, CDBG and Local.
|